These photos are examples of Physical Layer work I've done. Some customers needed to have their cabling and racks re-worked


slideshow image
Here is the finished rack. The goal was to improve looks and manageability. Note that all switch port status lights are now visible


slideshow image
This rack is in a major financial company downtown Dever. Here is the rack before I began repair. There are a total of four separate companies distributed in this system


slideshow image
Here is a closer view of the task ahead


slideshow image
This is the back side. Note decomissioned Token Ring cable on the rack and under the floor


slideshow image
Here is the finished rack. Companies are color coded, all switch ports and panel jack connections are documented. The rats nest remaining on the bottom right is telecom, which was not part of the project


slideshow image
Here is the back of the finished rack. Incoming circuits are color-coded to identify T1, ISDN, Frame Relay etc


slideshow image
Note the color coding


slideshow image
This is the wall behind the rack. I reworked all the feeds from biscuit to the rack.


slideshow image
This is a new installation. I cabled the office, assembled and mounted the rack at top right, installed and turned up the equipment


slideshow image
Close up of the finished rack


slideshow image
Another angle


slideshow image
This was a new satellite office for a customer. A contractor cabled the office and left off here


slideshow image
PBX is in place


slideshow image
WAN rack is in place


slideshow image
WAN rack is cabled. Note music on hold on the back panel on the right


slideshow image
Front of rack with door open


slideshow image
Completed job. Telecom was scheduled to deal with the one cable left hanging